CVHE Overhaul
Does anyone have anything they’re willing to share inregards to bidding a CVHE Overhaul? Im about to put a bid together for a CVHE500 that ruptured a tube in the condenser by means of which have not yet been determined. My company, nor my self have ever worked on this machine, only our local Trane has ever serviced it. Im interested in other member’s approach on handling the dehydration efforts and rust clean up, as well as maybe a list of parts and materials you all start off with. Myself and another collegaue have recently been to teardown school but this will be our first rodeo. Thanks in advance.
Ryan
Member Post, Member Post and 4 others4 Comments-
This being your first one, I would stay away from it. I had done nearly 75 overhauls before I ran into my first one with water in it and it’s still was not fun. Start out on an easy one. Overhaul class just teaches you enough to get yourself in trouble if you’re not careful.
2-
@jselvage I certainly understand where you’re coming from and most likely this will turn into a replacement situation but regardless, what was your procedure for dealing with the rust remediation? I envision cleaning the compressor components and places we could reach but what do you about areas that are inaccessible? Is there a filtration system you can run once the chiller is started to capture the remaining rust and corrosion? There’s bound to be a way to deal with the contamination.
-
-
Depending on the amount of moisture in the system, you may be able to purge nitrogen to help push out the moisture and install an additional eductor with a large filter drier to clean up the rust that the refrigerant will clean off the inside of the machine. You may want to call Hudson Technologies or another refrigerant company to flush the machine for you after you’re back together.
1 -
From what I have seen, if you have to take apart and replace bearings or other internals of a CVHF/CVHE dual-stage compressor that is about a half-mil job on its own and it is NOT easy nor quick to do.
Getting into the shells with rust and it honestly might be a better recommendation to just replace the chiller. Depends on tonnage, features, etc. of course but a new chiller from Trane is like a $1M thing and if the setup is a “drop & swap” sorta deal that is probably going to be better for the customer.
Of course keep in mind I’m a design engineer for chillers not a tech, my push is going to be biased towards replacement if the damage is bad enough and there is likely compressor damage.
-